Location: Visible in the Type column on the Work List, Manage Schedules, and Report Dashboard.
The Data:
| Acronym | Activity Name | Definition |
| PM | Preventive Maintenance | A system-generated work order to perform maintenance on a specific asset (e.g., "Filter Change on AHU-1"). |
| SI | Scheduled Inspection | A system-generated work order used for administrative tasks or general checks not tied to a specific barcoded asset (e.g., "Quarterly Fire Drill"). |
| RS | Scheduled Round | A system-generated work order that guides a user through a route of multiple assets (e.g., "Fire Extinguisher Check"). |
| WI | Work From Inspection | A work order automatically generated when a specific inspection question is answered negatively (e.g., answering "Fail" on a check triggers a repair WI). |
| Standards | Compliance Standards | Activities flagged with a Red Flag icon. These are mandatory regulatory or brand-required tasks (e.g., Legionella testing) and cannot have blackout dates,. |
Comments
0 comments
Article is closed for comments.